Clash Coordination

icon

Qualified Architects

icon

Software Proficiency

icon

Quick Turnarounds

icon

Multiple Business Models

BIM Clash Coordination Services assist in detecting interference between trades during preconstruction. We offer clash detection and coordination services to Mechanical, Electrical, Plumbing, Fire Protection, Architecture, and Structural trades. The result is a fully coordinated model that integrates all trades’ models. Our services bring in synergy between multiple building systems so that everything works in complete harmony. Our BIM Clash Coordination Services help Architects, Contractors, and Engineers complete projects within deadlines and budgets.

Benefits of BIM Clash Coordination Services

  • Fully coordinated 3D model
  • Clash detection in real-time
  • Minimal reworks and delays during construction
  • Improved project planning
  • Efficient utilization of the available building space
  • A Reduced number of change orders
  • Enhanced Constructability on the basis of the clash-free model
  • Cost and time savings due to fully coordinated model
  • Ensures optimal access space for equipment and unit

 

Generally, a clash materializes when two building elements occupy the same area. In BIM, the 3D model enhances visualization, which facilitates clash detection. We resolve interferences between MEP, architectural and structural elements by sharing clash snapshots through WebEx conferences. 

Our BIM Clash detection and coordination services cover the preparation of virtual 3D BIM coordination drawings to ensure that the model is fully coordinated and free from clashes. It minimizes instances of expensive reworks and wastage of time during construction. Early detection of clashes also assists estimators and surveyors in preparing accurate Quantity Take-offs, therefore increasing productivity. 

Clashes can be of two types, hard and soft. The differentiating factor between the two is the effort needed to resolve them. Soft clashes can be fixed easily with slight modifications in the BIM model, while hard clashes require extensive coordination between multiple parties.

 

  • Re-routing utilities
  • Resizing elements
  • Modifying elevations

We share proposals with clients with suggestions to resolve clashes.

Charlottesville, Virginia, USA
Alderman Library Renewal
  • 3D Modeling
  • Constructability Review
  • +5
Learn More
Thibodaux, LA
Bayou Community Academy
  • 3D Modeling
  • Clash Coordination
  • +3
Learn More
Toronto ON, Canada
Mount Pleasant Station
  • Constructability Review
  • Concrete Contractors
  • +3
Learn More
Texas, US
Hillel New Center for Jewish Life
  • 3D Modeling
  • Architectural Design
  • +3
Learn More
New Orleans, LA
Career Technical High School
  • 3D Modeling
  • Clash Coordination
  • +3
Learn More
San Francisco, California
150 Bocana Street
  • 3D Modeling
  • Architectural Design
  • +3
Learn More

Technical Samples

Printable Brochure

We'd Love To Hear About Your Next Project.

Let's Talk