info@pinnacleinfotech.com
+1 713 780 2135
Qualified Architects
Software Proficiency
Quick Turnarounds
Multiple Business Models
We perform a thorough constructability review to identify issues at the pre-construction stage to –
We work on BIM models based on the client’s RFI response. We document the status of all RFIs in a log and follow up regularly with clients to resolve all issues during the pre-construction stage. As a result, constructability review prevents work stoppages, reduces the chances of rework and wastage of material, and minimizes cost overruns before the construction process starts.
It aims to review all the construction phases from start to finish during the early design phase. The constructability assessment recognizes and solves different issues before the construction process begins and helps reduce errors and delays. the review
Using tools like Navisworks, we focus on drawing analysis to undertake constructability reviews and detect clashes accurately. At Pinnacle, the following constructability issues are detected and solved:
At Pinnacle, we analyze construction documents thoroughly to detect errors that may obstruct construction later. When we see any flaw in construction documents, we raise RFIs (Request for Information) and then send them to clients for review.
Email*
Download Brochure
Δ
Brochure will be sent over the provided Email address as well.