Design Support & Validation


Our engineering team builds intelligent BIM model to design complex building systems with greater efficiency. This gives all stakeholders a clear idea of design intent enabling them to modify the design to achieve the outcomes they want, thus minimizing risk of costly changes later.

We follow SMACNA, ASHRAE and other appropriate standards for design work process. Different design options are simulated and analyzed to develop more efficient and cost-effective solutions. Some of these solutions include:

  • Revit based heat load calculation and generation of HVAC layouts
  • Sizing and calculation of HVAC ducts and pipes
  • Illumination calculation and generation of light and power layout
  • Calculation & creation of Fire fighting layout based on NFPA standards and hazard classifications
  • Creation of sanitary and water supply layouts based on fixture unit values and pipe sizing
  • Validation of equipment capacity for all services
  • Creation of Technical Schedules and Updating the same based on design iterations
  • Pressure loss reports and velocity legend creations

Electrical Design Validation

Our Electrical Design Validation for Lighting & Small Power:

  • Checking Lighting Illumination of the area using Dialux Software
  • Preparing the DB Schedules & Trunking Calculations
  • Adding or removing circuits to achieve Voltage Drop from DB to final circuits
  • Providing Wire & Conduit Sizes
  • Balancing the Load
  • Providing Earth fault Loop Impedance for each circuit
  • Providing Demand factor for DB schedules

Our Electrical Design Validation for Cable Tray Routes (MV & LV):

  • Providing Accumulative Voltage drop calculations
  • Providing Cable tray sizes & routes
  • Checking Electrical Single Line Diagram
  • Providing Short Circuit Current Calculation

Our Electrical Design Validation for Firm Alarm:

  • Connecting all equipment to respective room
  • Providing separate loop for fire alarm speakers
  • Providing Control Modules for Fans, Motorized Dampers & Pumps
  • Providing Monitor Module for FHC & HRFHC
  • Providing Isolator Module after equipment
  • Providing Supervisory Module for speakers
  • Providing Sequence Numbering for all fire alarm equipment

Our Design Validation for Mechanical Ducting:

  • Validating the Equipment capacity depending on the Schedule & Plan
  • Verifying the Plan & Schematic
  • Providing Duct Sizes based on the project specifications
  • Changing the Routing due to constructability issues
  • ESP Calculations
  • Duct sizing comparison sheet

Our Design Validation for Mechanical Piping:

  • Validating the equipment capacity depending on the Schedule & Schematic
  • Verifying the Plan & Schematic
  • Changing the Routing due to constructability issues
  • Providing pipe sizes based on the project specifications

Our Design Validation for Plumbing:

  • Verifying floor/other drains with the Schematic & System Layouts from design document
  • Checking the pipe size and changing it as per IPC/SBC requirements
  • Ensuring continuity of piping for system coordination with design intent
  • Checking the entire design process & sorting out design issues
  • Validating design issues from the primary set of design document (if any)

Our Design Validation for Fire Fighting

  • Checking sprinkler coverage & providing it as per NFPA
  • Checking & changing the pipe as per pipe schedule recommended by NFPA
  • Checking the obstructions to sprinkler spray pattern & providing adequate sprinklers below/near the obstructions as per NFPA
  • Maintaining maximum or minimum sprinkler distance from slab and nearest wall as per NFPA
  • Providing minimum 100mm spool pipe between fittings (constructability point of view)
  • Providing flushing valve & auto air release valves as per NFPA that are missed out in base design IFC (Operation & maintenance point of view)

Load_balancing_validation_Design-Support-&-Validation_pinnacle_infotech

Validating_pressure_loss_report_design_validation_support_Pinnacle_Infotech

hydrant_system_design_calculations_design_validation_support_pinnacle_infotech