Tallahassee Memorial Hospital
- Location: Tallahassee, Florida, USA
- Execution Year: February, 2017
Brief Info
Pinnacle created the Electrical BIM Model of Tallahassee Memorial Healthcare – a hospital project for renovation and expansion of the M.T. Mustian Center 72-Bed ICU & Surgery Tower, consisting of a building with 8 floors including, Ground, Level 1 to 5 & Penthouse/Roof. The hopital contains 28 operating rooms, 4 interventional suites for neurosurgical and vascular procedures and 72 adult medical/surgical intensive care beds. The purpose of construction was to modernize the operating rooms and adult intensive care units to meet the growing demand in the region. The facility will house all the necessary services for the operating rooms and the intensive care beds, such as pre-admission testing, perioperative services, post anesthesia care unit, sterile processing services, blood banking, respiratory therapy, CT imaging, pharmacy and materials management. The anticipated project construction cost is approximately $250 million. The start date for actual construction was June 2016 and the end date will be Dec 2018.
for further info please open project profile PDFKey Facts
422,767 Sq ft
Project Area400
LOD4 Engineers
Team Size