Nuclear Power Training Unit
- Location: Charleston, South Carolina, USA
- Execution Year: April, 2016
Brief Info
Pinnacle executed the BIM solution for PNPTU project, which is a training institution consisting of 2 main buildings – 2701 & 2711, each with 3 floors. The main
purpose of construction is to provide training.
Key Facts
389,468 Sq Ft
Project Area3 Engineers
Team Size