MT SAN Antonio College


  • Location:  Stanton, California, USA
  • Execution Year:  November, 2015
plumbing_&_mechanical_bim_model_mt_san_antonio_college
boiler_room_model_mt_san_antonio_college
mechanical_shop_drawing_mt_san_antonio_college
overhead_plumbing_&_mechanical_bim_model_mt_san_antonio_college

Brief Info

Pinnacle executed the BIM Model of Mt. San Antonio College – an educational institute in Stanton, California, USA spread over a project area of 208,288 sq. ft. The project consisted of 3 buildings (A+B+C), each containing 4 floors

for further info please open project profile PDF

Key Facts

  • 208,288 Sq Ft

    Project Area
  • 400

    LOD
  • 8 Engineers

    Team Size