Moberly Sports Center


  • Location:  London, UK
  • Execution Year:  December, 2016

Brief Info

Pinnacle created the Clash Detection and Clash Report generation of Residential & Leisure Space for Moberly Sports Center Building (including Basement Level, Ground Floor, Mezzanine, Transfer Level, First Floor, Second Floor, Third Floor, Fourth Floor & Fifth Floor). The BIM model was divided into separate levels focusing on particular building location for efficient working and coordination among various trades. The breakups were necessary to reduce file size so that the files can be smoothly handled and delivered avoiding technical glitches.

for further info please open project profile PDF

Key Facts

  • 307,848 Sq ft

    Project Area
  • 200

    LOD
  • 2 Engineers

    Team Size