Pinnacle created the 3D BIM model of new Education Building construction (1 Building consisting of 3 Floors, spread over 11 zones) of Catawba Ridge High School of Walker-White, Inc. for fabrication at Level of Development (LOD) 400.
The models were used to produce shop drawing for construction and also to meet various project objectives including 3D coordination, clash mitigation, quantity take-offs, visualization and 4D capabilities for scheduling, phasing, sequencing and digital mock-ups.
The BIM model of the Education Building was divided into separate levels and zones. The divisions helped in efficient working and coordination of various trades by concentrating on particular location of the building. Moreover, the breakups were necessary to reduce the file size so that the files can be smoothly handled anddelivered avoiding technical glitches.

for further info please open project profile PDF

Key Facts

  • 530,000 sq ft

    Project Area
  • 400

    LOD
  • 8 Engineers

    Team Size