123 Cermak-Hilton


  • Location:  Macomb, Illinois, USA
  • Execution Year:  2017
architectural_bim_123_Cermak-Hilton
clash_123_Cermak-Hilton
clash_coordination_123_Cermak-Hilton
piping_shop_drawing_123_Cermak-Hilton
sheet_metal_shop_drawing_123_Cermak-Hilton

Brief Info

Pinnacle created the BIM models of 123 Cermak Hilton, consisting of 1 Building with 4 Floors spread over 2 zones (Level-5 – 23)for converting Revit Model to Fabrication 2017 at Level of Development 350. The models are used to produce shop drawing for new construction and meet various project objectives including 3D Coordination, Clash Mitigation, Quantity Take-offs, Visualization and 4D Capabilities for Scheduling, Phasing, Sequencing and Digital Mock-ups. The BIM model of the hotel was divided into separate levels and zones. The divisions helped in efficient working and coordination of various trades by concentrating on particular location of the building. Moreover, the breakups were necessary to reduce the file size so that the files can be smoothly handled and delivered avoiding any technical glitches.

for further info please open project profile PDF

Key Facts

  • 342,443 sq. ft.

    Project Area
  • 350

    LOD