Southside High School

Share

  • Location:  Youngsville, Louisiana, USA
  • Execution Year:  March, 2017

Brief Info

Pinnacle created the 3D BIM model of Southside High School (consisting of 1 Building with 3 Floors spread over 10 zones) – an educational project at Level of Development 400 to produce shop drawings for construction and also to meet various objectives of the project including 3D coordination, clash mitigation, quantity take-offs, visualization and 4D capabilities for scheduling, phasing, sequencing and digital mock-ups. The BIM model of the High school was divided into separate levels and zones for efficient working and coordination of various trades by concentrating on particular location of the building. Moreover, the breakups helped to reduce the file size to handle and deliver files smoothly, avoiding technical glitches.

for further info please download project profile PDF

Key Facts

  • 256,874 Sq ft

    Project Area
  • 400

    LOD
  • 8 Engineers

    Team Size