Rolling Hills

Share

  • Execution Year:  March, 2017

Brief Info

Pinnacle created the 3D Coordinated BIM Model of Rolling Hills for Mechanical, Electrical & Plumbing trades, consisting of 3 Buildings (Club House with 4 floors, Fitness with 4 floors & Pool House – 2 levels) at LOD 400 to produce shop drawing for construction and to meet various objectives of the project including 3D coordination, clash mitigation, quantity take-offs, visualization and 4D capabilities for scheduling, phasing, sequencing and digital Mock-ups. The BIM models of Club House were divided into separate levels and zones for efficient working and coordination among various trades by concentrating on particular location of the building. Moreover, the breakups were necessary to reduce the file size to handle and deliver the files smoothly, avoiding technical glitches.

for further info please download project profile PDF

Key Facts

  • 142,3000 Sq ft

    Project Area
  • 400

    LOD