Pinnacle was the BIM solution provider for the Meldahl Hydro Electric facility on the Ohio River at Foster, Kentucky. The project comprised of 3 massive Turbines producing 105 MW of power. The Meldahl project’s proposed 138kV transmission line now carries electricity to the national grid crossing the Ohio River and running 2.2 miles to an existing PJM interconnect in Clermont County. We offered 3D Modeling of Cast in Place & Precast Concrete, Constructability Analysis, Lift Drawings & Dynamic Quantity Schedule for this Hydro Electric Facility. The models and lift drawings delivered by Pinnacle underwent thorough checking for design discrepancies, adherence to codes, constructability and coordination issues.

Key Facts

  • 109,160 CY

    Project Area
  • 15 Engineers