Fairfield Central Elementary School

Share

  • Location:  Fairfield, Ohio, USA
  • Execution Year:  November, 2016

Brief Info

Pinnacle created the 3d Models and Shop Drawings for the 1st and 2nd floors (divided into 3 areas – A+B+C) of Fairfield Central Elementary School. In the first floor, we have worked in the ductwork and piping – A+B+C and in the second floor, we have worked in the ductwork and floor piping – B+C. The purpose of preparing the models and shop drawings is constructability review and MEP installation.

for further info please download project profile PDF

Key Facts

  • 224,050 Sq ft

    Project Area
  • 400

    LOD
  • 8 Engineers

    Team Size