Dubai Metro 2020

Share

  • Location:  Doha, Ad Dawhah, Qatar
  • Execution Year:  January, 2015

Brief Info

Pinnacle executed the 3D Modeling, Video Presentation and 4D simulation of Dubai Metro Urban Rail System, which consists of a total length of 75 kilometers. The Dubai Metro Project is the world’s longest driverless rail system including the construction of viaducts, tunnels, 45 stations, depots and car parks. The Dubai Metro network is a fully automated and driverless system running on two lines, the Red Line and the Green Line, the majority of which are elevated. Both lines consist of underground sections where they run through Dubai‚Äôs Central Business District (CBD) and the lines cross the Creek to link the south and north banks.

for further info please download project profile PDF

Key Facts

  • 484,000 Sqft

    Project Area
  • 200

    LOD
  • 6 Engineers

    Team Size