Douglass Elementary School

Share

  • Location:  Boulder, Colorado, USA
  • Execution Year:  December, 2016

Brief Info

Pinnacle created the 3D BIM model of Douglass Elementary school for M/S US ENGINEERING at LOD 400 to produce shop drawing for construction and also to meet various project objectives such as 3D coordination, clash mitigation, quantity take-offs, visualization and 4D capabilities for scheduling, phasing, sequencing and Digital Mock-ups. The BIM model of the School building was divided into separate zones which helped in efficient working and coordination of various trades by concentrating on particular building location. Moreover, the breakups helped to reduce the file size in order that the files can be smoothly handled and delivered avoiding technical glitches.

for further info please download project profile PDF

Key Facts

  • 64,855 Sq ft

    Project Area
  • 400

    LOD
  • 4 Engineers

    Team Size