Daytona International Speedway

Share

  • Location:  Daytona Beach, Florida, USA
  • Execution Year:  August, 2013

Brief Info

The Daytona International Speedway is zooming ahead on the largest renovation (“Daytona Rising,”)in the Florida venue’s 54-year history. DAYTONA Rising is a $400 million re-imagining of an American icon – Daytona International Speedway. Five expanded and redesigned entrances, or “injectors,” will lead fans to a series of escalators and elevators, transporting them to four different concourse levels. Each level features spacious social areas, or “neighborhoods,” along the nearly mile-long front stretch. 40 million pounds of steel. 40000 individual pieces of galvanized steel used. Steel construction began in Oct, 2013 and will continue until Jan, 2016. At the conclusion of the redevelopment, Daytona International Speedway will have approximately 101,000 permanent, wider and more comfortable seats, twice as many restrooms and three times as many concession stands. In addition, the Speedway will feature over 60 luxury suites with track side views and a completely revamped hospitality experience for corporate guests. The project officially broke ground in early July, 2013 and is expected to be completed in time for the 2016 Rolex 24 At Daytona and DAYTONA 500.

for further info please download project profile PDF

Key Facts

  • 86,111 Sq.Ft.

    Project Area
  • 3 Engineers

    Team Size