38th and Perry Office Building

Share

  • Location:  Denver, Denver, USA
  • Execution Year:  January, 2016

Brief Info

Pinnacle undertook the Mechanical Modeling of 38th Perry Office Building in Denver, USA, which is spread over a project area of 10,000 sq. ft. The building consisted of Boiler Mechanical room and the purpose of the project was to build 2 RTU’S and Makeup unit with Exhaust fans. HWS/HWR was supplied to the building. The project was occupied with snow-melt Heat Exchanger.

for further info please download project profile PDF

Key Facts

  • 10,000 Sq.Ft.

    Project Area
  • 300

    LOD