Engineering, Procurement & Construction

FILTER BY YEAR
FILTER BY SECTORS
FILTER BY COUNTRY
FILTER BY STATE

Dam Construction Project

Location: Mississippi River, MS, USA

SCOPE OF WORK:

The drawings to be converted consisted of dam work as actually constructed for Mississippi River Lock & Dam No. 7. Drawings consisted of Lock & Valve Mechanisms, Water Stage Recorder Wells, Location of Wall Armour and Protection Angle, Miter Gates, Side Walk & Girders – General Drawings, details of Gusset Plates & Pins etc. Table of Parts was also drawn in the required drawings. The drawings were first converted in DWG format and then exported to Microstation and necessary editing was carried out to give DGN format output. As the drawings were of Structural and Mechanical type, projections were maintained. Layering standard was supplied by customer in which levels were maintained to ensure proper export to Microstation. Given Elevation dimensions were also maintained. Customer supplied standard line types, layer names, colors, text styles were maintained.

SPECIFICATION:

Year

:

2010

More Information

Type of Drawings : Structural & Mechanical detail

Business Enquiry Form

Fields with (*) must be completed.

 Morning Afternoon Evening

 Please contact me immediately.

 Please send me more information about your company and services.