Construction scheduling is one of the key processes during the development of construction projects. As Building Information Models (BIM) gain more and more in importance for the design process, the scheduling process also has to be integrated into the collaborative model based working environment.
A project scheduler estimates the overall project duration as well as major cost factors for labor and equipment. He takes input from several other domains. The resulting construction schedule is used later on by other stakeholders as a means for project management, as well as triggering procurement and logistic processes.
Our construction management consultants possess the engineering and construction experience to provide real-world, cost-effective solutions to the everyday challenges that owners, contractors, engineers, and architects face throughout the construction process.