Modeling
BIM technology is used to create a virtual model of the building. This model helps to check and eliminate any interferences that would have arised during the actual construction phase.
BIM was a made easy structure for Solaris Project
Pinnacle Infotech Inc.

BIM structuring helped in an easy and proper implementation of MEP at the Solaris Project in Vail. :-

Solaris is a multi-use project being built at Vail in Colo. The project consists of six storied condominiums and at least three stories housing retailing parking facilities and offices. Moreover, the project also includes a 10 lane bowling arena, a loading dock for accommodating delivery trucks. No wonder, modern technology and BIM services will be sought for such projects.

The final design for the construction came up in 2007. The whole project was being built under a modern MEP model with BIM structure. The MEP design documents for plumbing, mechanical and electrical were ready by 1st October, 2007. In fact, the MEP and architectural CD's got issued in August, 2008. In March, 2009, the erection of the steel structure was finally over.

We Provide

The use of BIM structuring made the process of collaboration among the architects, MEP engineers, fire protection contractors, construction managers smooth. Some of the penetrations were done before the erection of steel models, the others were done after the steel structure erection was over.

SCI modeled the steel framework in Tekla Structure. Solaris team ensured collaborative work from the working team. The design procedure was done in Tekla Structure to ensure proper design coordination. The pre-contract detailing procedure of the steel framework made the design easy to comprehend. The design then went to the steelwork contractor. He made the detailing on Tekla structure. This way, the construction procedure got accelerated and tighter bid was ensured from the subcontractors part. The design becomes construction-friendly with lesser amount of field fixes. Every week DPA and SCI exchanged 3D designes Project data was shared with the help of Industry Foundation Classes standard of data exchange. IFC is a standard is set by building SMART.

BIM structuring ensured proper participation of the development team, the owner of the project in the project. Moreover, a clear BIM design projected a clear design with a clear view of the architectural spaces. A clear view offered by the BIM model and small size of the files developed in Tekla models help the project team members. The BIM procedure led to the 3D modeling of the construction. Solaris building has a quite a complex structure. Had there been no BIM models, things would have proved to be hectic for the design team. The owner and the design team, literally got a clear geometric of the entire construction.

Relevant Link:
http://www.gostructural.com/magazine-article----bim_and_ipd_victory_in_vail-8079.html
http://www.tekla.com/international/solutions/references/Pages/solaris-redevelopment.aspx

 

 